One step: First, we will put the three-axis vibration test bench on a horizontal surface, use anchor bolts to fix the equipment feet, and then put the rubber feet on the bottom of the equipment into the foot socket. Placed on the mount;
Two steps: then place the controller on a workbench that is slightly away from the device, as long as it is level;
Three steps: Then insert the connecting line on the triaxial vibration test bench into the rear jack of the controller. It should be noted that the vibration direction of the body corresponds to the output direction socket on the controller;
Four steps: Put the power switch on and use the power cord to connect the controller to the power supply.





